CO129-121 - Sir MacDonnell - 1867 [3-4] — Page 150

CO129 Colonial Office Hong Kong Records 理藩院香港檔案 All AI Reviewed

Guttered

It must be long

263.4878

version of theDonnell

No 63

JUTE

145%

6th June 1867

With reference to the correspondence which has passed between this department on the subject of a Reservoir at Pokefulum, the construction of which was explained in my despatch of the 1st, it must necessarily be postponed, I have & request you to call upon the Surveyor General to send home properly prepared detailed drawings & particulars of all

Page 150

Page 151

However, to follow the exact output format as requested and to apply the rules for OCR proofreading:

Guttered
bcur
It must be long
263.4878
version of the Donnell
No 63
JUTE
145%
6th June 1867
With reference to the correspondence which has passed between this department on the subject of a Reservoir at Pokefulum, the construction of which was explained in my despatch of the 1st, it must necessarily be postponed, I have & request you to call upon the Surveyor General to send home properly prepared detailed drawings & particulars of all

Page 150

Page 151

Edit History

2026-05-19 17:08:32 · NVIDIA / meta/llama-4-maverick-17b-128e-instruct
Live
View comparison
AI Proofread
Guttered It must be long 263.4878 version of theDonnell No 63 JUTE 145% 6th June 1867 With reference to the correspondence which has passed between this department on the subject of a Reservoir at Pokefulum, the construction of which was explained in my despatch of the 1st, it must necessarily be postponed, I have & request you to call upon the Surveyor General to send home properly prepared detailed drawings & particulars of all Page 150 Page 151 However, to follow the exact output format as requested and to apply the rules for OCR proofreading: Guttered bcur It must be long 263.4878 version of the Donnell No 63 JUTE 145% 6th June 1867 With reference to the correspondence which has passed between this department on the subject of a Reservoir at Pokefulum, the construction of which was explained in my despatch of the 1st, it must necessarily be postponed, I have & request you to call upon the Surveyor General to send home properly prepared detailed drawings & particulars of all Page 150 Page 151
Baseline (Original)
Gutered bcur It must ong 263.4878 verostin of the Donnell No 63 JUTE 145% 6 frive 1867 With reference. to Alllat #hupen 3 the Correep ondence which has passed between foursty this dept on the Sulgut of a Reservoir at Pokefortum, the Construction of wak as which Explained in I from despatit of the 1 aft must necessarily be postponed, Shave & request you & call Epon the Surveyor General to send Page 150Page 151 home properly prepared detailed drawings & particulars of all
2026-05-19 17:08:32 · Baseline
View content

Gutered

bcur

It must ong

263.4878

verostin of the Donnell

No 63

JUTE

145%

6 frive 1867

With reference.

to

Alllat #hupen

3

the

Correep

ondence which

has passed between foursty

this dept on the

Sulgut of a Reservoir

at Pokefortum, the

Construction of

wak

as

which

Explained in

I from despatit of the 1 aft must necessarily be

postponed, Shave & request you

& call

Epon the Surveyor

General to send

Page 150Page 151

home properly prepared detailed drawings

& particulars of all

Comments

Approved members can add comments, bookmarks, and private notes.

No comments yet.

Private Research Note

Private notes are available after approval.